The accuracy of lead times is currently severely impacted by supply chain disruptions which you can track on our Network Status tracker. Material shortages and freight delays are expected to continue.
Note that every supplier on Lumi has slightly different production lead times, this page lists a conservative average across suppliers.
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 15% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 15% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 15% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 15% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 8 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 8 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 8 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 3 weeks | 1 week |
Reorder | 1 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | No tariff |
Reorder | 4 weeks | 6 weeks | 2 weeks | No tariff |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 14 weeks | 1 week |
Reorder | 12 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 9 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 8 weeks | 1 week |
Reorder | 6 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 7 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 12 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 14 weeks | 1 week |
Reorder | 12 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 9 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 7 weeks | 6 weeks | 2 weeks | |
Reorder | 5 weeks | 6 weeks | 2 weeks |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 12 weeks | 1 week |
Reorder | 11 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 8 weeks | 1 week |
Reorder | 7 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 7 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 0 weeks | 0 weeks |
Reorder | 0 weeks | 0 weeks |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 12 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 3 weeks | 1 week |
Reorder | 2 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 8 weeks | 6 weeks | 2 weeks | |
Reorder | 6 weeks | 6 weeks | 2 weeks |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 17 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 10 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 3 weeks | 1 week |
Reorder | 1 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | No tariff |
Reorder | 4 weeks | 6 weeks | 2 weeks | No tariff |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 7 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 3 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 3 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 10 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 8 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 15% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 15% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 4 weeks | 1 week |
Reorder | 2 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 10 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 10 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 9 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 15% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 15% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 9 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 9 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 12 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 7 weeks | 1 week |
Reorder | 5 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 8 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 5 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 4 weeks | 1 week |
Reorder | 2 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 10 weeks | 5 weeks | 2 weeks | 15% |
Reorder | 8 weeks | 5 weeks | 2 weeks | 15% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 14 weeks | 1 week |
Reorder | 12 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 14 weeks | 1 week |
Reorder | 12 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 4 weeks | 1 week |
Reorder | 2 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 8 weeks | 1 week |
Reorder | 5 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | |
Reorder | 4 weeks | 6 weeks | 2 weeks |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 5 weeks | 1 week |
Reorder | 3 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 3 weeks | 1 week |
Reorder | 1 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | No tariff |
Reorder | 4 weeks | 6 weeks | 2 weeks | No tariff |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 12 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 7 weeks | 6 weeks | 2 weeks | No tariff |
Reorder | 5 weeks | 6 weeks | 2 weeks | No tariff |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 8 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 7 weeks | 6 weeks | 2 weeks | No tariff |
Reorder | 5 weeks | 6 weeks | 2 weeks | No tariff |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 3 weeks | 1 week |
Reorder | 1 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | No tariff |
Reorder | 4 weeks | 6 weeks | 2 weeks | No tariff |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 7 weeks | 1 week |
Reorder | 5 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 4 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 3 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 7 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 12 weeks | 5 weeks | 2 weeks | 25% |
Reorder | 9 weeks | 5 weeks | 2 weeks | 25% |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 6 weeks | 1 week |
Reorder | 4 weeks | 1 week |
U.S.United States | Production | Ground freight |
---|---|---|
First order | 9 weeks | 1 week |
Reorder | 8 weeks | 1 week |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 5 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |
Asia | Production | Ocean freight | Air freight | China tariff |
---|---|---|---|---|
First order | 6 weeks | 6 weeks | 2 weeks | 25% |
Reorder | 4 weeks | 6 weeks | 2 weeks | 25% |